“Analysis of the Causes of Failure in 5Cr-1Mo Pipes Mounted in a Preheating Furnace”. Frattura Ed Integrità Strutturale, vol. 6, no. 20, Mar. 2012, pp. 22-31, https://doi.org/10.3221/IGF-ESIS.20.03.