[1]
“Analysis of the causes of failure in 5Cr-1Mo pipes mounted in a preheating furnace”, Fra&IntStrut, vol. 6, no. 20, pp. 22–31, Mar. 2012, doi: 10.3221/IGF-ESIS.20.03.